= Status = <<Anchor(2010-11-15-servers-down)>> == 2010-11-15: cooling water system outage for some clusters == On last friday evening one of the cooling water pumps installed in ETZ/D/96.2 stopped working correctly. This forced some of the racks in this server room to shutdown in order to protect the servers from thermal damage. All clusters from IFH, IBT, BIWI, TIK, IKT and VAW were affected. The facility management is working on solving the problem. A technician is scheduled to be on-site, we expect the problem to be remedied at 4 PM. |
#rev 2018-08-27 mreimers = General Informations = * This page lists announcements and status messages for IT services managed by [[http://www.isg.ee.ethz.ch/|ISG.EE]]. * For notifications and announcements of central IT services managed by ID, please visit https://www.ethz.ch/services/de/it-services/service-desk.html * For a detailed status overview of central IT services managed by ID, please visit https://ueberwachung.ethz.ch ||||<style="border-width: 1px 0px; border-color: rgb(85, 136, 238); padding: 0.6em;">'''Status-Key''' || ||<style="border: medium none;"> {{attachment:Status/green.gif}} ||<style="border: medium none;">Resolved || ||<style="border: medium none;"> {{attachment:Status/orange.gif}} ||<style="border: medium none;">Still working but with some errors || ||<style="border-width: medium medium 1px; border-top: medium none rgb(85, 136, 238); border-left: medium none rgb(85, 136, 238); border-right: medium none rgb(85, 136, 238); border-color: rgb(85, 136, 238);"> {{attachment:Status/red.gif}} ||<style="border-width: medium medium 1px; border-top: medium none rgb(85, 136, 238); border-left: medium none rgb(85, 136, 238); border-right: medium none rgb(85, 136, 238); border-color: rgb(85, 136, 238);">Pending || = Current status reports = <<Anchor(2020-07-11-storage-downtime)>> == Planned project/ archive storage downtime and client reboot == '''Status:''' {{attachment:Status/green.gif}} 2020-07-11 12:00:: Migration has been completed, all services are back to operational state. 2020-07-11 08:00:: Migration started, services are shutdown 2020-07-11 8:00-12:00:: Start of planned maintenance work. Project/ archive storage services (known under the names "ocean", "bluebay", "lagoon" and "benderstor") will not be available. ISG-managed Linux clients will be rebooted. <<Anchor(2020-06-04-svnsrv-upgrade)>> == svn.ee.ethz.ch downtime for server upgrade == '''Status:''' {{attachment:Status/green.gif}} 2020-06-04 07:05:: Webservices for managing SVN repositories are enabled. 2020-06-04 06:15:: Systemupgrade is done and access to the SVN repositories via the `svn` and `https` transport protocols are back online. 2020-06-04 06:00:: The server servicing the SVN repositories will be upgraded to a new operating system version. During this timeframe outages for access to the SVN repositories are expected. <<Anchor(2020-05-17-cluster-abuse)>> == European HPC cluster abuse == '''Status:''' {{attachment:Status/green.gif}}<<BR>> Recently European HPC clusters have been attacked and abused for mining purposes. The D-ITET Slurm and SGE clusters have not been compromised. We are monitoring the situation closely. 2020-05 17 08:30:: No successful login from known attacker IP addresses could be determined, none of the files indicating being compromised have been found on our file systems 2020-05-16 14:30:: No unusal cluster job activity was observed <<Anchor(2020-05-04-itetnas04-upgrade)>> == D-ITET Netscratch downtime for server upgrade == '''Status:''' {{attachment:Status/green.gif}} 2020-05-04 06:00:: Server upgrade has been completed. 2020-05-04 06:00:: The server servicing the D-ITET Netscratch service will be upgraded to a new operating system version. During this timeframe outages for the NFS service will be expected. <<Anchor(2020-04-07-network-interuption)>> == Network outage ETx router == '''Status:''' {{attachment:Status/green.gif}} 2020-04-07 05:30:: There was an issue on the Router `rou-etx`. ID networking team trackled and solved the issue. There was about a 10min interuption for the ETx networking zone affecting almost all ISG.EE maintained systems. <<Anchor(2020-04-06-mira-maintenance)>> == login.ee.ethz.ch: Reboot for maintenance == '''Status:''' {{attachment:Status/green.gif}} 2020-04-06 05:35:: System behind `login.ee.ethz.ch` has been rebootet for maintenance and increase available resources. See the [[RemoteAccess|information on access D-ITET resources remotely]]. To distribute better the load user are encouraged to use the VPN service whenever possible. <<Anchor(2020-02-18-nostro-maintenance)>> == itet-stor (FindYourData) Server maintenance: Reconfiguration of VM parameters == '''Status:''' {{attachment:Status/green.gif}} 2020-02-18 19:03:: System again up and running. 2020-02-18 19:00:: Scheduled downtime for the [[Workstations/FindYourData|itet-stor/FindYourData service]] due to maintenance work on the underlying server. <<Anchor(2020-01-20-nostro-os-upgrade)>> == itet-stor (FindYourData) Server migration: New operating system version == '''Status:''' {{attachment:Status/green.gif}} 2020-01-20 07:15:: OS upgrade done, there were short interruptions to the [[Workstations/FindYourData|itet-stor/FindYourData service]]. 2020-01-20 06:00:: We will update the server servicing the [[Workstations/FindYourData|FindYourData service]] from Debian jessie 8 to Debian stretch 9. There will be short downtimes accessing this service during the update. <<Anchor(2019-10-01-maintenance-project-storage)>> == Project Storage maintenance == '''Status:''' {{attachment:Status/green.gif}} 2019-10-01 06:00:: The needed maintenance was performend and storage services (NFS and Samba) are again up online. 2019-10-01 05:50:: We will perform HW maintenance of the system holding the project storage. NFS and Samba services to access the storage will be offline for 10-15min between 05:50 and 06:15. <<Anchor(2019-09-17-power-outage)>> == Power outage == '''Status:''' {{attachment:Status/green.gif}} 2019-09-17 12:11:: Power reestablished. 2019-09-17 10:29:: Power outage in ET area. For up-to-date information please visit https://ethz.ch/services/de/it-services/service-desk.html#meldungen <<Anchor(2019-07-31-outage-project-storage)>> == Outage of Project Storage == '''Status:''' {{attachment:Status/green.gif}} 2019-09-17 12:11:: At the moment the power has been reestablished after the outage there was again a failure of the storage system until 12:30. 2019-09-05 15:30:: Project homes on bluebay are unavailable until 19:10 due to another hardware failure 2019-08-28 07:00:: Whilst the service is running stable we have still open ongoing communication with the cluster filesystem developers to further track down the issues seen in the last weeks. 2019-08-22 06:00:: Planned reboot of second system in cluster and related managment node. 2019-08-21 06:00:: Planned reboot of first system (expect downtime of 5-10 minutes). 2019-08-18 03:45:: Full sync of the missing storage targed finally succeeded. For now full redudancy regained. We are still in contact with the developers of the cluster filesystem to further analyse the problem. 2019-08-14 08:00:: Full redundancy is still not regained. We are as well in contact with the developers of the cluster filesystem to analyse the current problems. 2019-08-12 07:00:: Sync of the last storage target is ongoing and reached 82%. 2019-08-08 18:00:: Heavy load on the storage system while still needing to perform resync caused high latencies on access. Several services were unavailable or responded very laggy until up 22:30. Situation is normalizing but until the full re-sync succeeds there is potential for further outages. 2019-08-08 15:55:: The storage system is operational again and an initial high load phase due to resynchronization is finished. 2019-08-08 14:28:: There are again problems with the storage servers... 2019-08-07 16:30:: Due to errors while re-syncing the remaining target we needed to restart a full sync on this last target. Unfortunately this means that redundancy in the storage system will not yet be regained. 2019-08-07 06:55:: High I/O load on the system during further syncing caused accessing issues on the projects between 06:15 and 06:55. There is still an issue with one target which needs a re-sync which might cause further access outages. 2019-08-06 10:50:: Re-syncing is still ongoing, one storage target is missing, redundancy of the underlying storage system is not yet regained. 2019-08-05 13:00:: Re-syncing of the broken targets is still ongoing, thus redundancy of the storage system is not yet regained. 2019-08-02 17:00:: NFS throughput has normalized, causes are investigated. Recurrences have to be expected. 2019-08-02 15:50:: High load on the storage server slowed down NFS connections down to timeouts. 2019-08-02 15:05:: The synchronization from the healthy system 2 to system 1 has again been started. Once this synchronization is complete (in roughly 3 days), the system is finally redundant again. 2019-08-02 12:45:: The hardware has been fixed. The storage services (NFS/Samba) have been powered on. 2019-08-02 11:50:: The failing hardware component is currently being replaced by the hardware supplier. 2019-08-02 10:00:: The failing hardware of system 1 has been identified. Availability of hardware replacement parts and successful data consistency check will determine the availability of the storage services. 2019-08-02 08:30:: The replaced hardware in system 1 is again faulty, while system 2 seems (hardware-wise) ok. Due to data inconsistency, the storage service can not provide its services. 2019-08-01 16:30:: While system 1 has not synchronized all data from system 2, the latter system goes down. Starting from here, project and archive storage is not available anymore. 2019-07-31 22:00:: A high load of one of the backup processes leads to an NFS service interruption. After postponing that backup process, NFS recovers. 2019-07-31 21:30:: The hardware failure lead to two corrupt storage targets on system 1. After reinitializing the affected targets the synchronization of data from the healthy system 2 starts. 2019-07-31 15:45:: Service is restored, hardware exchange was successful. Restoring full redundancy is pending. 2019-07-31 15:00:: Project homes on bluebay are unavailable due to replacement of faulty hardware part. Estimated downtime of ~1h. 2019-07-31 07:40:: Service is restored, still running with reduced redundancy 2019-07-31 06:20:: Project homes on bluebay are unavailable due to deactivation of faulty hardware part 2019-07-31 02:40:: Storage system 2 took over. Service is restored but running with reduced redundancy. 2019-07-31 02:30:: Project homes on bluebay are unavailable due to a hardware failure on system 1 <<Anchor(2019-07-22-outage-net-scratch)>> == Outage net_scratch service == '''Status:''' {{attachment:Status/green.gif}} 2019-08-28 07:00:: The old server is now decomissioned. We will re-bootstrap the service on new hardware in next weeks and re-announce the service when ready to be used. 2019-08-12 07:00:: Read-only access to partially recoverable data has been removed again as planned. We are planning to re-instantiate the service on new hardware. 2019-07-26 12:00:: Read-only access to partially recoverable data has been made available on `login.ee.ethz.ch` under `/mnt`. This volume will be available until August 9th. 2019-07-23 08:00:: We are in contact with the hardware vendor to see on further steps to take with the respective RAID controller and double-check if there is an issue with it. Data on the `net_scratch` is with a high change lost. 2019-07-22 15:35:: We still try to recover the data but the filesystem got corruption due to a hardware hickup on the underlying raid system. Affected by this is [[Services/NetScratch|/itet-stor/<username>/net_scratch]]. 2019-07-22 12:00:: Filesystem errors for the device holding the `net_scratch` service were reported. The server is currently offline due to severe errors on the filesystem. <<Anchor(2019-07-19-ptrace-disable)>> == Disabling ptrace on managed Debian/GNU Linux computers == '''Status:''' {{attachment:Status/green.gif}} 2019-07-22 09:00:: New images are rolled out. As clients reboot they will automatically pick up this new release with a fixed Linux kernel. 2019-07-21 15:00:: New images are available. On next reboot of an managed client will boot with a patched kernel and the mitigation disabled. 2019-07-19 13:00:: A current Linux kernel bug allows any unprivileged user to gain root access. A proof of concept code snippet that exploits this vulnerability is publicly available. To protect our systems we temporarily disabled {{{ptrace(2)}}} on all managed Linux systems. All software depending on {{{ptrace(2)}}} will completely or at least partially fail. A prominent example is the GNU Debugger {{{gdb}}}. A patched Linux kernel will come soon. Once this new kernel is running, we will enable {{{ptrace}}} again. <<Anchor(2019-07-18-outage-project-storage)>> == Outage of Project Storage == '''Status:''' {{attachment:Status/green.gif}} 2019-07-18 18:45:: Service is back to normal 2019-07-18 17:00:: Project homes on bluebay are unavailable <<Anchor(2019-04-24-Power-Outage-Services-down)>> == D-ITET services outages == '''Status:''' {{attachment:Status/green.gif}} 2019-04-24 14:18:: Virtualisation cluster back with full redudancy. User affecting virtual machines were back online already at 07:30. 2019-04-24 13:00:: A issue between the redunant switches caused the network issue, leading the cluster to be in an inconsistent state and rebooting all virtual machines. Networking people are investigating further the issue between the switches. 2019-04-24 09:00:: Further analysis ongoing, but healt status of virtualisation cluster was affected leading to resets of all hosted virtual machines. 2019-04-24 07:30:: We are bringing services back to normal. 2019-04-24 07:00:: A planned outage in ETZ building caused stability issues on serveral services of D-ITET in particular HOME and mail services. <<Anchor(2019-02-25-verdi-repair-filesystem-inconsitency)>> == Downtime HOME server: Repair filesystem inconsistency == '''Status:''' {{attachment:Status/green.gif}} 2019-02-25 06:18:: System is back online. 2019-02-25 06:00:: we identified a filesystem usage accounting discrepancy on one filesystem on the HOME server requiring taking down the server and issuing a repair of the underlying filesystem. The home storage is the default storage location for personal accounts on computers managed by ISG.EE. <<Anchor(2019-01-25-D-ITET-RDS-Maintenance)>> == One of two RDS servers is not reachable == '''Status:''' {{attachment:Status/green.gif}} 2019-01-25 23:50:: Maintenance issues have been resolved. All RDS servers are up and running now. 2019-01-25 14:00:: RDS maintenance window is terminated but one server has still pending updates. Logins are not allowed until this issue has been fixed. = Archived status reports = [[Status/Archive/2015|2015]] [[Status/Archive/2014|2014]] [[Status/Archive/2013|2013]] [[Status/Archive/2012|2012]] [[Status/Archive/2011|2011]] [[Status/Archive/2010|2010]] |
Line 14: | Line 201: |
[[CategoryEDUC]] |
General Informations
This page lists announcements and status messages for IT services managed by ISG.EE.
For notifications and announcements of central IT services managed by ID, please visit https://www.ethz.ch/services/de/it-services/service-desk.html
For a detailed status overview of central IT services managed by ID, please visit https://ueberwachung.ethz.ch
Status-Key |
|
|
Resolved |
|
Still working but with some errors |
|
Pending |
Current status reports
Planned project/ archive storage downtime and client reboot
Status:
- 2020-07-11 12:00
- Migration has been completed, all services are back to operational state.
- 2020-07-11 08:00
- Migration started, services are shutdown
- 2020-07-11 8:00-12:00
- Start of planned maintenance work. Project/ archive storage services (known under the names "ocean", "bluebay", "lagoon" and "benderstor") will not be available. ISG-managed Linux clients will be rebooted.
svn.ee.ethz.ch downtime for server upgrade
Status:
- 2020-06-04 07:05
- Webservices for managing SVN repositories are enabled.
- 2020-06-04 06:15
Systemupgrade is done and access to the SVN repositories via the svn and https transport protocols are back online.
- 2020-06-04 06:00
- The server servicing the SVN repositories will be upgraded to a new operating system version. During this timeframe outages for access to the SVN repositories are expected.
European HPC cluster abuse
Status:
Recently European HPC clusters have been attacked and abused for mining purposes. The D-ITET Slurm and SGE clusters have not been compromised. We are monitoring the situation closely.
- 2020-05 17 08:30
- No successful login from known attacker IP addresses could be determined, none of the files indicating being compromised have been found on our file systems
- 2020-05-16 14:30
- No unusal cluster job activity was observed
D-ITET Netscratch downtime for server upgrade
Status:
- 2020-05-04 06:00
- Server upgrade has been completed.
- 2020-05-04 06:00
- The server servicing the D-ITET Netscratch service will be upgraded to a new operating system version. During this timeframe outages for the NFS service will be expected.
Network outage ETx router
Status:
- 2020-04-07 05:30
There was an issue on the Router rou-etx. ID networking team trackled and solved the issue. There was about a 10min interuption for the ETx networking zone affecting almost all ISG.EE maintained systems.
login.ee.ethz.ch: Reboot for maintenance
Status:
- 2020-04-06 05:35
System behind login.ee.ethz.ch has been rebootet for maintenance and increase available resources.
See the information on access D-ITET resources remotely. To distribute better the load user are encouraged to use the VPN service whenever possible.
itet-stor (FindYourData) Server maintenance: Reconfiguration of VM parameters
Status:
- 2020-02-18 19:03
- System again up and running.
- 2020-02-18 19:00
Scheduled downtime for the itet-stor/FindYourData service due to maintenance work on the underlying server.
itet-stor (FindYourData) Server migration: New operating system version
Status:
- 2020-01-20 07:15
OS upgrade done, there were short interruptions to the itet-stor/FindYourData service.
- 2020-01-20 06:00
We will update the server servicing the FindYourData service from Debian jessie 8 to Debian stretch 9. There will be short downtimes accessing this service during the update.
Project Storage maintenance
Status:
- 2019-10-01 06:00
- The needed maintenance was performend and storage services (NFS and Samba) are again up online.
- 2019-10-01 05:50
- We will perform HW maintenance of the system holding the project storage. NFS and Samba services to access the storage will be offline for 10-15min between 05:50 and 06:15.
Power outage
Status:
- 2019-09-17 12:11
- Power reestablished.
- 2019-09-17 10:29
Power outage in ET area. For up-to-date information please visit https://ethz.ch/services/de/it-services/service-desk.html#meldungen
Outage of Project Storage
Status:
- 2019-09-17 12:11
- At the moment the power has been reestablished after the outage there was again a failure of the storage system until 12:30.
- 2019-09-05 15:30
- Project homes on bluebay are unavailable until 19:10 due to another hardware failure
- 2019-08-28 07:00
- Whilst the service is running stable we have still open ongoing communication with the cluster filesystem developers to further track down the issues seen in the last weeks.
- 2019-08-22 06:00
- Planned reboot of second system in cluster and related managment node.
- 2019-08-21 06:00
- Planned reboot of first system (expect downtime of 5-10 minutes).
- 2019-08-18 03:45
- Full sync of the missing storage targed finally succeeded. For now full redudancy regained. We are still in contact with the developers of the cluster filesystem to further analyse the problem.
- 2019-08-14 08:00
- Full redundancy is still not regained. We are as well in contact with the developers of the cluster filesystem to analyse the current problems.
- 2019-08-12 07:00
- Sync of the last storage target is ongoing and reached 82%.
- 2019-08-08 18:00
- Heavy load on the storage system while still needing to perform resync caused high latencies on access. Several services were unavailable or responded very laggy until up 22:30. Situation is normalizing but until the full re-sync succeeds there is potential for further outages.
- 2019-08-08 15:55
- The storage system is operational again and an initial high load phase due to resynchronization is finished.
- 2019-08-08 14:28
- There are again problems with the storage servers...
- 2019-08-07 16:30
- Due to errors while re-syncing the remaining target we needed to restart a full sync on this last target. Unfortunately this means that redundancy in the storage system will not yet be regained.
- 2019-08-07 06:55
- High I/O load on the system during further syncing caused accessing issues on the projects between 06:15 and 06:55. There is still an issue with one target which needs a re-sync which might cause further access outages.
- 2019-08-06 10:50
- Re-syncing is still ongoing, one storage target is missing, redundancy of the underlying storage system is not yet regained.
- 2019-08-05 13:00
- Re-syncing of the broken targets is still ongoing, thus redundancy of the storage system is not yet regained.
- 2019-08-02 17:00
- NFS throughput has normalized, causes are investigated. Recurrences have to be expected.
- 2019-08-02 15:50
- High load on the storage server slowed down NFS connections down to timeouts.
- 2019-08-02 15:05
- The synchronization from the healthy system 2 to system 1 has again been started. Once this synchronization is complete (in roughly 3 days), the system is finally redundant again.
- 2019-08-02 12:45
- The hardware has been fixed. The storage services (NFS/Samba) have been powered on.
- 2019-08-02 11:50
- The failing hardware component is currently being replaced by the hardware supplier.
- 2019-08-02 10:00
- The failing hardware of system 1 has been identified. Availability of hardware replacement parts and successful data consistency check will determine the availability of the storage services.
- 2019-08-02 08:30
- The replaced hardware in system 1 is again faulty, while system 2 seems (hardware-wise) ok. Due to data inconsistency, the storage service can not provide its services.
- 2019-08-01 16:30
- While system 1 has not synchronized all data from system 2, the latter system goes down. Starting from here, project and archive storage is not available anymore.
- 2019-07-31 22:00
- A high load of one of the backup processes leads to an NFS service interruption. After postponing that backup process, NFS recovers.
- 2019-07-31 21:30
- The hardware failure lead to two corrupt storage targets on system 1. After reinitializing the affected targets the synchronization of data from the healthy system 2 starts.
- 2019-07-31 15:45
- Service is restored, hardware exchange was successful. Restoring full redundancy is pending.
- 2019-07-31 15:00
- Project homes on bluebay are unavailable due to replacement of faulty hardware part. Estimated downtime of ~1h.
- 2019-07-31 07:40
- Service is restored, still running with reduced redundancy
- 2019-07-31 06:20
- Project homes on bluebay are unavailable due to deactivation of faulty hardware part
- 2019-07-31 02:40
- Storage system 2 took over. Service is restored but running with reduced redundancy.
- 2019-07-31 02:30
- Project homes on bluebay are unavailable due to a hardware failure on system 1
Outage net_scratch service
Status:
- 2019-08-28 07:00
- The old server is now decomissioned. We will re-bootstrap the service on new hardware in next weeks and re-announce the service when ready to be used.
- 2019-08-12 07:00
- Read-only access to partially recoverable data has been removed again as planned. We are planning to re-instantiate the service on new hardware.
- 2019-07-26 12:00
Read-only access to partially recoverable data has been made available on login.ee.ethz.ch under /mnt. This volume will be available until August 9th.
- 2019-07-23 08:00
We are in contact with the hardware vendor to see on further steps to take with the respective RAID controller and double-check if there is an issue with it. Data on the net_scratch is with a high change lost.
- 2019-07-22 15:35
We still try to recover the data but the filesystem got corruption due to a hardware hickup on the underlying raid system. Affected by this is /itet-stor/<username>/net_scratch.
- 2019-07-22 12:00
Filesystem errors for the device holding the net_scratch service were reported. The server is currently offline due to severe errors on the filesystem.
Disabling ptrace on managed Debian/GNU Linux computers
Status:
- 2019-07-22 09:00
- New images are rolled out. As clients reboot they will automatically pick up this new release with a fixed Linux kernel.
- 2019-07-21 15:00
- New images are available. On next reboot of an managed client will boot with a patched kernel and the mitigation disabled.
- 2019-07-19 13:00
- A current Linux kernel bug allows any unprivileged user to gain root access. A proof of concept code snippet that exploits this vulnerability is publicly available.
To protect our systems we temporarily disabled ptrace(2) on all managed Linux systems. All software depending on ptrace(2) will completely or at least partially fail. A prominent example is the GNU Debugger gdb.
A patched Linux kernel will come soon. Once this new kernel is running, we will enable ptrace again.
- A current Linux kernel bug allows any unprivileged user to gain root access. A proof of concept code snippet that exploits this vulnerability is publicly available.
Outage of Project Storage
Status:
- 2019-07-18 18:45
- Service is back to normal
- 2019-07-18 17:00
- Project homes on bluebay are unavailable
D-ITET services outages
Status:
- 2019-04-24 14:18
- Virtualisation cluster back with full redudancy. User affecting virtual machines were back online already at 07:30.
- 2019-04-24 13:00
- A issue between the redunant switches caused the network issue, leading the cluster to be in an inconsistent state and rebooting all virtual machines. Networking people are investigating further the issue between the switches.
- 2019-04-24 09:00
- Further analysis ongoing, but healt status of virtualisation cluster was affected leading to resets of all hosted virtual machines.
- 2019-04-24 07:30
- We are bringing services back to normal.
- 2019-04-24 07:00
- A planned outage in ETZ building caused stability issues on serveral services of D-ITET in particular HOME and mail services.
Downtime HOME server: Repair filesystem inconsistency
Status:
- 2019-02-25 06:18
- System is back online.
- 2019-02-25 06:00
- we identified a filesystem usage accounting discrepancy on one filesystem on the HOME server requiring taking down the server and issuing a repair of the underlying filesystem. The home storage is the default storage location for personal accounts on computers managed by ISG.EE.
One of two RDS servers is not reachable
Status:
- 2019-01-25 23:50
- Maintenance issues have been resolved. All RDS servers are up and running now.
- 2019-01-25 14:00
- RDS maintenance window is terminated but one server has still pending updates. Logins are not allowed until this issue has been fixed.